Parliament proceedings | Envisaged for a year, Chandrayaan-2 orbiter likely to last for 7 years

[ad_1]

Read More/Less


The mission has accomplished the objective of expanding lunar scientific knowledge

The life of the orbiter of Chandrayaan-2 was initially envisaged for a year but the Indian Space Research Organisation (ISRO) expects it to last for seven years, Union Minister Jitendra Singh said on Wednesday.

In a written response to a question in the Lok Sabha on India’s second lunar mission, Jitendra Singh, the Minister of state in the Prime Minister’s Office, said Chandrayaan-2 was a highly complex mission to develop and demonstrate the key technologies for end-to-end lunar mission capability, including soft-landing and roving on the lunar surface.

The mission comprised an orbiter, lander and rover.

Planned to land on the South Pole of the Moon, Chandrayaan-2 was launched on July 22, 2019. However, the lander Vikram hard-landed on September 7, 2019, crashing India’s dream to become the first nation to successfully land on the lunar surface in its maiden attempt.

“But for achieving soft landing at the intended spot, the other objectives of the mission have been significantly attained. So much so, that against an initially envisaged one-year life of orbiter, we expect it to be serving for seven years,” Mr. Singh said.

The mission has accomplished the objective of expanding lunar scientific knowledge through detailed study of topography, mineralogy, surface chemical composition, thermo-physical characteristics and tenuous lunar atmosphere leading to a better understanding of the origin and evolution of the moon, it added.

In August last year, Mr. Singh had announced that Chandrayaan-2 orbiter has captured the images of craters on the Moon. They were christened “Sarabhai crater” after Vikram Sarabhai, father of the Indian space programme.

Watch | Chandrayaan’s Vikram lander: what we know so far

The Sarabhai Crater captured in 3D images shows that it has a depth of around 1.7 kilometres, taken from its raised rim, and the slope of crater walls is in between 25 to 35 degree. These findings will help space scientists to understand further the process on the lunar region filled with lava, Singh had said.

ISRO’s missions are known to have an enhanced life than what is earlier envisaged.

The planned life span of Mars Orbiter Mission (MOM)/ Mangalyaan after its insertion into the Mars orbit on September 24, 2014 was six months and it was to complete on March 24, 2015. However, the MOM is still functioning and sending pictures.

You have reached your limit for free articles this month.

Subscription Benefits Include

Today’s Paper

Find mobile-friendly version of articles from the day’s newspaper in one easy-to-read list.

Unlimited Access

Enjoy reading as many articles as you wish without any limitations.

Personalised recommendations

A select list of articles that match your interests and tastes.

Faster pages

Move smoothly between articles as our pages load instantly.

Dashboard

A one-stop-shop for seeing the latest updates, and managing your preferences.

Briefing

We brief you on the latest and most important developments, three times a day.

Support Quality Journalism.

*Our Digital Subscription plans do not currently include the e-paper, crossword and print.

[ad_2]

READ FULL ARTICLE HERE

ISRO launches sounding rocket to study attitudinal variations in neutral winds, plasma dynamics

[ad_1]

Read More/Less


The Indian Space Research Organisation (ISRO) has launched a sounding rocket to study attitudinal variations in the neutral winds and plasma dynamics from Sriharikota spaceport.

ISRO has developed a series of sounding rockets called Rohini series, important among them being RH-200, RH-300 and RH-560, number in the name indicating the diameter of the rocket in mm, according to the Bengaluru-headquartered space agency.

“Launch of sounding rocket (RH-560) to study attitudinal variations in the neutral winds and plasma dynamics carried out today (Friday) at SDSC SHAR, Sriharikota,” ISRO tweeted.

Sounding rockets are one or two stage solid propellant rockets used for probing the upper atmospheric regions and for space research.

They also serve as easily affordable platforms to test or prove prototypes of new components or subsystems intended for use in launch vehicles and satellites.

You have reached your limit for free articles this month.

Subscription Benefits Include

Today’s Paper

Find mobile-friendly version of articles from the day’s newspaper in one easy-to-read list.

Unlimited Access

Enjoy reading as many articles as you wish without any limitations.

Personalised recommendations

A select list of articles that match your interests and tastes.

Faster pages

Move smoothly between articles as our pages load instantly.

Dashboard

A one-stop-shop for seeing the latest updates, and managing your preferences.

Briefing

We brief you on the latest and most important developments, three times a day.

Support Quality Journalism.

*Our Digital Subscription plans do not currently include the e-paper, crossword and print.

[ad_2]

READ FULL ARTICLE HERE

Isro aims for 7 more launches from India in 2021 | India News – Times of India

[ad_1]

Read More/Less


BENGALURU: With the pandemic having enveloped 2020, Isro is targetting at least seven more launches, including the uncrewed Gaganyaan mission, from India this year, while PSU New Space India Limited (NSIL) plans to launch one satellite through a foreign launch provider.
Of the six other than Gaganyaan to be launched from the spaceport in Sriharikota, three will be earth observation, including one for ocean studies, one remote sensing satellite, a commercial launch, and one navigation satellite (see graphic).
A science satellite to study the Sun (Aditya-L1) that was initially targeted for this year won’t happen. And, among the launch vehicles, other than the PSLV, Isro will launch three GSLV missions, including the mark-III as part of the uncrewed Gagnayaan mission. Two more will be SSLV (small satellite launch vehicles) class of rockets.

Aside from this, as reported by TOI earlier, NSIL is planning to launch the GSAT-24, being acquired and launched for a private customer — Tata Sky’s DTH business — through Arianespace.
Isro chairman K Sivan said: “If you look at the number, then we consider it to be 14 more missions as each launch is two missions (one launch vehicle and one satellite). We are confident of achieving this target and top priority is for Gaganyaan.”
He said Aditya had to be pushed to next year as the next launch window — missions to Moon, Sun and other planets have specific windows during which launches can take place — is only available then.
5 Key Desi Techs
Stating that the human rating of GSLV is progressing as planned, Sivan said 2021 will see multiple indigenous technologies tested.
“We will have two SSLV launch vehicles technology demonstration flights, we will be testing the revamped GSLV in terms of rockets. On the satellite technology front, we are looking to test the election propulsion on satellites, use two atomic clocks developed indigenously on the NVS-01 and also a key component called TWTA (Traveling Wave Tube Amplifiers) in a communication satellite,” Sivan said.
Isro is hoping to completely stop importing these technologies, in line with the Centre’s Atmanirbhar mission, and this year will prove key in deciding how quickly the space agency can shift to indigenous technology. “Apart from giving us the edge technologically, it will also save us a lot of foreign exchange,” Sivan said.

[ad_2]

READ FULL ARTICLE HERE

India, Japan space agencies review cooperation

[ad_1]

Read More/Less


Earth observation, lunar cooperation and satellite navigation figure in discussion

Indian and Japanese space agencies on Thursday reviewed cooperation in earth observation, lunar cooperation and satellite navigation, and also agreed to explore opportunities for cooperation in “space situational awareness and professional exchange programme”.

This was agreed during a bilateral meeting between the Indian Space Research Organisation (ISRO) and the Japan Aerospace Exploration Agency (JAXA) held virtually.

“Both agencies signed an Implementing Arrangement for collaborative activities on rice crop area and air quality monitoring using satellite data,” an ISRO statement said.

India and Japan are already working on a joint lunar polar exploration (LUPEX) mission and the two space agencies have been working on the mission that aims to send a lander and rover to the Moon’s south pole around 2024.

Early this month, India and Italy decided to explore opportunities in earth observation, space science and robotic and human exploration.

Last month, India and Australia signed an amendment to the MoU which will build on the Comprehensive Strategic Partnership. Both countries are also in discussions for Australia to host vital tracking infrastructure to support the Gaganyaan manned space flight mission.

You have reached your limit for free articles this month.

Subscription Benefits Include

Today’s Paper

Find mobile-friendly version of articles from the day’s newspaper in one easy-to-read list.

Unlimited Access

Enjoy reading as many articles as you wish without any limitations.

Personalised recommendations

A select list of articles that match your interests and tastes.

Faster pages

Move smoothly between articles as our pages load instantly.

Dashboard

A one-stop-shop for seeing the latest updates, and managing your preferences.

Briefing

We brief you on the latest and most important developments, three times a day.

Support Quality Journalism.

*Our Digital Subscription plans do not currently include the e-paper, crossword and print.

[ad_2]

READ FULL ARTICLE HERE

ISRO develops radar for joint earth observation satellite mission with NASA

[ad_1]

Read More/Less


“NISAR” is a joint collaboration for a dual-frequency L and S-band SAR for earth observation.

Indian Space Research Organisation (ISRO) has completed development of a Synthetic Aperture Radar (SAR) capable of producing extremely high-resolution images for a joint earth observation satellite mission with the U.S. space agency National Aeronautics and Space Administration (NASA).

NASA-ISRO SAR (NISAR) is a joint collaboration for a dual-frequency L and S-band SAR for earth observation.

“NISAR will be the first satellite mission to use two different radar frequencies (L-band and S-band) to measure changes in our planet’s surface less than a centimetre across”, according to NASA.

NASA and Bengaluru-headquartered ISRO signed a partnership on September 30, 2014, to collaborate on and launch NISAR.

The mission is targeted to launch in early 2022 from ISRO’s Sriharikota spaceport in Andhra Pradesh’s Nellore district, about 100km north of Chennai.

NASA is providing the mission’s L-band SAR, a high-rate communication subsystem for science data, GPS receivers, a solid-state recorder and payload data subsystem.

ISRO is providing the spacecraft bus, the S-band radar, the launch vehicle and associated launch services for the mission, whose goal is to make global measurements of the causes and consequences of land surface changes using advanced radar imaging.

The S-band SAR payload of NISAR satellite mission was flagged off by the Secretary in the Department of Space and ISRO Chairman K Sivan on March 4 through virtual mode.

The payload has been shipped from ISRO’s Ahmedabad-based Space Applications Centre (SAC) to NASA’s Jet Propulsion Laboratory (JPL) at Pasadena in the U.S. for integration with the latter’s L-band SAR payload, an ISRO statement said.

“NISAR would provide a means of disentangling highly spatial and temporally complex processes ranging from ecosystem disturbances to ice sheet collapses and natural hazards including earthquakes, tsunamis, volcanoes and landslides”, ISRO said.

NASA added that the mission will measure Earth’s changing ecosystems, dynamic surfaces and ice masses, providing information about biomass, natural hazards, sea level rise and groundwater, and will support a host of other applications.

“NISAR will observe Earth’s land and ice-covered surfaces globally with 12-day regularity on ascending and descending passes, sampling Earth on average every six days for a baseline three-year mission”, NASA said on the mission’s website.

“This allows the mission to observe a wide range of Earth processes, from the flow rates of glaciers and ice sheets to the dynamics of earthquakes and volcanoes”.

NISAR uses a sophisticated information-processing technique known as SAR to produce extremely high-resolution images. Radar penetrates clouds and darkness, enabling NISAR to collect data day and night in any weather.

“The instrument’s imaging swath the width of the strip of data collected along the length of the orbit track is greater than 150 miles (240km), which allows it to image the entire Earth in 12 days,” it was stated.

“Over the course of multiple orbits, the radar images will allow users to track changes in croplands and hazard sites, as well as to monitor ongoing crises such as volcanic eruptions. The images will be detailed enough to show local changes and broad enough to measure regional trends.”

“As the mission continues for years, the data will allow for better understanding of the causes and consequences of land surface changes, increasing our ability to manage resources and prepare for and cope with global change,” according to NASA.

“NASA requires a minimum of three years of global science operations with the L-band radar, and ISRO requires five years of operations with the S-band radar over specified target areas in India and the Southern Ocean”, it said.

You have reached your limit for free articles this month.

Subscription Benefits Include

Today’s Paper

Find mobile-friendly version of articles from the day’s newspaper in one easy-to-read list.

Unlimited Access

Enjoy reading as many articles as you wish without any limitations.

Personalised recommendations

A select list of articles that match your interests and tastes.

Faster pages

Move smoothly between articles as our pages load instantly.

Dashboard

A one-stop-shop for seeing the latest updates, and managing your preferences.

Briefing

We brief you on the latest and most important developments, three times a day.

Support Quality Journalism.

*Our Digital Subscription plans do not currently include the e-paper, crossword and print.

[ad_2]

READ FULL ARTICLE HERE

Satellite set for March 28 launch will help India keep an eye on borders near real-time

[ad_1]

Read More/Less


Experts said positioning the state-of-the-art agile earth observation satellite in geostationary orbit has key advantages.

India plans to launch on March 28 an earth observation satellite that will provide it near real-time images of its borders and also enable quick monitoring of natural disasters.

GISAT-1 is slated to be lofted into space by GSLV-F10 rocket from Sriharikota spaceport in Andhra Pradesh’s Nellore district, about 100 kms north of Chennai.

“We are looking to launch this Geo imaging satellite on March 28, subject to weather conditions”, an official of the Bengaluru-headquartered Indian Space Research Organisation (ISRO) told PTI on Sunday.

The rocket will place the spacecraft in a geosynchronous orbit. It will be subsequently positioned in geostationary orbit, about 36,000 kms above earth’s equator, using its onboard propulsion system.

The launch of GISAT-1 onboard GSLV-F10 rocket was originally planned for March 5 last year but postponed a day before the blast-off due to technical reasons.

Experts said positioning the state-of-the-art agile earth observation satellite in geostationary orbit has key advantages.

“It’s going to be a game-changer in some sense for India”, a Department of Space official said.

“With onboard high resolution cameras, the satellite will allow the country to monitor the Indian land mass and the oceans, particularly its borders continuously”.

Listing the objectives of the mission, ISRO has earlier said the satellite would provide near real-time imaging of the large area region of interest at frequent intervals.

It would help in quick monitoring of natural disasters, episodic and any short-term events.

The third objective is to obtain spectral signatures of agriculture, forestry, mineralogy, disaster warning, cloud properties, snow and glacier and oceanography.

GISAT-1 will facilitate near real-time observation of the Indian sub-continent, under cloud-free condition, at frequent intervals, ISRO said.

The planned launch of GISAT-1, weighing about 2,268 kg, comes close on the heels of the successful February 28 PSLV- C51 mission that orbited Brazil’s earth observation satellite Amazonia-1 and 18 co-passengers, including five built by students.

Secretary in the Department of Space and ISRO Chairman K Sivan told PTI last week that the technical issues that led to postponement of GISAT-1 mission have been resolved and the further delay in the launch was due to COVID-19-induced lockdown which affected normal work.

According to sources, GISAT-1 will be followed by the maiden flight of Small Satellite Launch Vehicle, ISRO’s compact launcher, likely in April.

SSLV has been designed to meet “launch on demand” requirements in a cost-effective manner for small satellites in a dedicated and ride-share mode.

It is a three-stage all solid vehicle with a capability to launch up to 500 kg satellite mass into 500 km low earth orbit (LEO) and 300 kg into Sun Synchronous Orbit (SSO).

By comparison, PSLV — the workhorse launch vehicle of ISRO — can take up to 1,750 kg payload into SSO of 600 km altitude.

With lower per kg launch cost, the mini launcher will have multiple satellite mounting options for nano, micro and small satellites.

Sivan had earlier termed the SSLV an innovative vehicle which can be assembled in just 72 hours.

“Instead of 60 days (for building a PSLV), it (SSLV) will be assembled in three days; instead of 600 people (needed to build a PSLV), it (SSLV) will be done by six people”, he had said.

You have reached your limit for free articles this month.

Subscription Benefits Include

Today’s Paper

Find mobile-friendly version of articles from the day’s newspaper in one easy-to-read list.

Unlimited Access

Enjoy reading as many articles as you wish without any limitations.

Personalised recommendations

A select list of articles that match your interests and tastes.

Faster pages

Move smoothly between articles as our pages load instantly.

Dashboard

A one-stop-shop for seeing the latest updates, and managing your preferences.

Briefing

We brief you on the latest and most important developments, three times a day.

Support Quality Journalism.

*Our Digital Subscription plans do not currently include the e-paper, crossword and print.

[ad_2]

READ FULL ARTICLE HERE

ISRO places Brazil’s Amazonia-1, 18 other satellites in orbit

[ad_1]

Read More/Less


53rd flight of PSLV-C51 marks first dedicated mission for New Space India Ltd, the commercial arm of ISRO.

ISRO on Sunday successfully launched Brazil’s optical earth observation satellite, Amazonia-1, and 18 co-passenger satellites from India [5] and the U.S.A. [13] from the Satish Dhawan Space Centre (SHAR) at Sriharikota.

The satellites were carried on board the PSLV-C51, the 53rd flight of India’s workhorse launch vehicle and the first dedicated mission for New Space India Ltd (NSIL), the commercial arm of ISRO. The mission was undertaken under a commercial arrangement with Spaceflight Inc., USA.

ISRO places Brazil’s Amazonia-1, 18 other satellites in orbit

 

The PSLV-C51, equipped with two solid strap-on boosters, the third such launch of the PSLV-DL variant, lifted off at 10.24 a.m. from the first launch pad at Sriharikota. 

DRDO pay-load

Of the 13 satellites from the U.S., one was a technology demonstration satellite and the remaining for 2-way communications and data relay. Among the five Indian satellites, one belongs to DRDO.

Five satellites belong to India including the Satish Dhawan SAT (SDSAT) built by Space Kidz India, a nano-satellite intended to study the radiation levels, space weather and demonstrate long range communication technologies, and the UNITYsat, a combination of three satellites intended for providing radio relay services. The other satellite belongs to DRDO.

 

The SDSAT developed by SpaceKids India has an engraving of Prime Minister Narendra Modi on the top panel of the satellite to show solidarity and gratitude for the atmanirbhar initiative and space privatisation, SpaceKidz said. The Bhagavad Gita was also sent on-board an SD card to give the scripture, which teaches oneness as the highest form of humanity, the highest honour, it said.

The UNITYsat was designed and built as a joint development by the Jeppiar Institute of Technology, Sriperumbudur, G.H. Raisoni College of Engineering, Nagpur and Sri Shakthi Institute of Engineering and Technology, Coimbatore.

Watching the Amazon

Roughly 16 minutes after lift-off, the PS-4 engine was cut-off and the Amazonia-1, weighing 637 kg, belonging to the Brazilian National Institute for Space Research (INPE), was separated a minute later. The satellite will further strengthen the existing structure by providing remote sensing data to users for monitoring deforestation in the Amazon region and for analysis of diversified agriculture across the Brazilian territory, according to ISRO. The Amazonia-1 was injected into its precise orbit of 758 km in a sun-synchronous polar orbit. 

“This moment represents the top of all this effort made by so many people in our National Institute for Space Research and our Space agency. This is a very important mission for Brazil and it represents a new era for Brazilian industry for satellites. This is one positive step of our partnership that is going to grow. Congratulations on a beautiful launch. We are going to work together and this is the beginning of our partnership,” Brazil’s Minister of Science, Technology and Innovation Marcos Cesar Pontes said.

Following that, the other 18 customer satellites were placed into their intended orbits. The entire operation of the mission took about 1 hour and 55 minutes to completion.

“This particular mission is special because these five Indian satellites are coming under the new space reform announced by the Government of India. These institutes have done an excellent job. ISRO has promoted, handheld and all along helped them to build these satellites technically correctly to launch them,” ISRO Chairman, K. Sivan said.

He said ISRO has 14 missions planned this year, including the first unmanned mission around the end of the year.

You have reached your limit for free articles this month.

Subscription Benefits Include

Today’s Paper

Find mobile-friendly version of articles from the day’s newspaper in one easy-to-read list.

Unlimited Access

Enjoy reading as many articles as you wish without any limitations.

Personalised recommendations

A select list of articles that match your interests and tastes.

Faster pages

Move smoothly between articles as our pages load instantly.

Dashboard

A one-stop-shop for seeing the latest updates, and managing your preferences.

Briefing

We brief you on the latest and most important developments, three times a day.

Support Quality Journalism.

*Our Digital Subscription plans do not currently include the e-paper, crossword and print.

[ad_2]

READ FULL ARTICLE HERE

Chandrayaan-3 launch delayed further to 2022

[ad_1]

Read More/Less


Chandrayaan-3 is critical for ISRO.

Chandrayaan-3, India’s third mission to Moon, is likely to be launched in 2022, ISRO chief K. Sivan has said.

The COVID-19 lockdown has hit several projects of the Indian Space Research Organisation (ISRO) including Chandrayaan-3, which was scheduled to be launched in late 2020, and Gaganyaan, the country’s first manned space mission.

Unlike its predecessor, Chandrayaan-3 will not have an orbiter.

“We are working on it. It is the same configuration like Chandrayaan-2 but it will not have an orbiter. The orbiter launched during Chandrayaan-2 will be used for Chandrayaan-3. With that we are working on a system and mostly the launch will be next year in 2022,” Mr. Sivan told PTI.

Chandrayaan-2, aimed at landing a rover on unchartered Lunar South Pole, was launched on July 22, 2019 on board the country’s most powerful geosynchronous launch vehicle.

However, the lander Vikram hard-landed on September 7, 2019, crashing India’s dream to become the first nation to successfully land on the lunar surface in its maiden attempt.

Chandrayaan-3 is critical for ISRO as it will demonstrate India’s capabilities to make landing for further interplanetary missions.

He said ISRO is targeting December to launch the first unmanned mission under the Gaganyaan project. The mission was originally scheduled to launch in December last year.

It will be followed by another unmanned mission and the third leg is the main module, he said.

Gaganyaan envisages to send three Indians to space by 2022. The four test pilots selected for the mission are currently undergoing training in Russia.

When asked about the launch of the third module of Gaganyaan – the manned mission – Mr. Sivan said, “A lot of technology needs to be demonstrated. We will decide on the time (of the manned mission) after checking whether all the technology is perfect.”

[ad_2]

READ FULL ARTICLE HERE